This $30 million project will include new ramps from southbound SR 417 to southbound Florida’s Turnpike and from northbound Florida’s Turnpike to northbound SR 417, along with a proposed sound wall along the southwest side of the interchange. BASE Consultants performed the design of overhead span sign structures, extension of existing box culverts, multi-post ground mounted signs, barrier wall mounted signs, strain poles to support ITS devices, and foundation design for relocated CCTV poles. Construction is scheduled to begin in late 2013 or early 2014 and finish by spring 2015.