Orlando Airport Wayfinding Project
BASE Consultants, as part of the MLM-Martin team performing Continuing Architectural Services for the Orlando International Airport, has [...]
BASE Consultants, as part of the MLM-Martin team performing Continuing Architectural Services for the Orlando International Airport, has [...]
The newest “island” at Universal Studios Islands of Adventure includes two two separate parts, the Village of Hogsmeade [...]
The primary focus of this facility is to provide access to the recently completed Chain of Lakes Trail, [...]
This project was done within our existing Continuing Structural Engineering Minors Contract with the University of Florida. BASE [...]
The Florida Hospital DeLand Digestive Health Center Renovation involves the conversion of an existing same-day surgery clinic into [...]
The project involved creating new temporary entrances in existing Target stores. The new entrances allowed the stores to [...]
This $2 million project scope included preparing a design criteria package for Airside 4 International Passenger Arrival Enhancements. [...]
This $5.1 million project scope includes road widening, retaining wall modifications, signage improvements, and toll booth and associated [...]
This design/build project involved replacing fourteen passenger elevators and three service elevators at the Orlando International Airport. Air [...]
BASE Consultants performed structural design for a 5,000 s.f. facility that will serve the Florida Keys Overseas Heritage [...]